DUE DILIGENCE

What to check before buying a hotel or ryokan in Tokyo

"Operating" in the sales materials does not mean the inspections are in order. This guide lists the documents and public records to collect and read before you sign.

Last checked

Six areas to check

Investigate in the wrong order and you end up commissioning costly surveys first. First gather what the public records and the seller's documents can tell you, and ask specialists only about the points that need professional judgment. There are six areas to check.

  • Building

    Whether there are certificates of confirmation and inspection and copies of periodic survey reports, and whether any order has been issued over a violation.

  • Fire safety

    Fire equipment inspection reports, fire-prevention property inspection reports, and whether the building appears in the Tokyo Fire Department's published lists.

  • Hotel business license

    Whose name the license is in, and whether it will be taken over or applied for again.

  • Land and rights

    The registered owner and rights, the zoning district, and whether the site borders a road for 2 m or more.

  • Earthquake resistance

    Whether construction began before June 1981, and whether seismic assessment results have been published.

  • Disasters

    The location on hazard maps for river flooding, inland flooding and storm surge, and sediment disaster warning areas.

For an operating hotel, also check the contracts with the operator and how reservations will be handed over. At the end there is a checklist you can print and use.

Building: certificate of inspection and periodic survey reports

The first things to get from the seller are the certificate of confirmation, the certificate of inspection and the drawings. Without a certificate of inspection, an architect has to investigate whether the building as it stands complies with the law, which adds cost and time (guide to converting a building or house into a hotel).

Periodic survey reports

  1. The owner arranges the survey

    For buildings used by many people, such as hotels and ryokans, the owner (or the manager, if there is a separate one) must have them surveyed periodically and report the results (Building Standards Act, Article 12(1)).

  2. An architect or surveyor checks

    A first-class or second-class architect or a qualified building surveyor (kenchikubutsu chosain) carries out the survey.

  3. The results go to the ward

    The results go to the ward, or to the Tokyo Metropolitan Government for buildings with a total floor area over 10,000 m². Ventilation equipment, emergency lighting and elevators have their own separate inspections and reports.

Periodic survey reports for hotels and ryokans in Tokyo (based on the Tokyo Metropolitan Urban Development Bureau's list)
Size of the hotel or ryokan partReporting intervalReporting period
Has a floor on the 3rd story or above, and a total floor area over 2,000 m²Every year1 November to 31 January of the following year
Any other building with a basement, a floor on the 3rd story or above, 300 m² or more on the 2nd floor, or over 300 m² in total (single-story buildings under 500 m² are excluded)Every 3 years (2025, 2028 …)1 May to 31 October

In the table, a "floor on the 3rd story or above" means one where the hotel part on that floor exceeds 100 m². Ask the seller for a copy of the most recent report and records of how the points raised were corrected.

Building drawings spread out on a desk
Whether the certificates of confirmation and inspection, the drawings and copies of the periodic survey reports are all available changes the scope of the architect's investigation.

Violation orders, and documents you can view at the ward office

ItemDetails
Violation ordersWhen a ward or the Tokyo Metropolitan Government orders a building that violates the law to be corrected, it gives public notice, for example by putting up a sign (Building Standards Act, Article 9). If there is such a sign on the building, check the content of the order with the ward.
Viewing the summariesAt the ward office you can ask to view the building plan summary (kenchiku keikaku gaiyosho) and the periodic survey report summary (Building Standards Act, Article 93-2; Enforcement Regulations, Article 11-3). When the seller's documents are incomplete, these give you an independent way to check what was confirmed and what was reported in the past.

Fire safety: two inspection reports and published violations

The Fire Service Act treats hotels and ryokans as buildings used by the general public, and requires two kinds of inspection and reporting. The results must be recorded and kept, so the seller should have copies.

Fire inspection reports for hotels and ryokans
InspectionBuildings coveredReport to the fire station
Fire equipment inspection (Fire Service Act, Article 17-3-3)Hotels and ryokans required to have fire equipment. For certain buildings, a licensed fire equipment engineer (shobo setsubishi) or a certified fire equipment inspector must carry out the inspectionOnce a year. The inspections themselves are carried out at intervals of up to one year, depending on the type of equipment
Periodic fire-prevention property inspection (Fire Service Act, Article 8-2-2)Hotels and ryokans that must appoint a fire prevention manager (capacity of 30 people or more) and either have a capacity of 300 people or more, or have a hotel part in a basement or on the 3rd floor or above with only one staircase leading to ground levelOnce a year (inspected by a certified fire-prevention property inspector)

The treatment differs if the staircase is outdoors, so check with the fire station whether the building is subject to the fire-prevention property inspection.

A fire detector mounted on a concrete ceiling
In copies of the inspection reports, look for equipment marked as defective and the records of later repairs (illustrative).

Lists published by the Tokyo Fire Department

  • Buildings named for fire-safety breaches

    Since 1 April 2011, the Tokyo Fire Department has published the name, address and details of the violation for buildings that breach the requirement to install indoor fire hydrants, sprinkler systems or automatic fire alarm systems and have not corrected it within a set period after being notified. An entry is removed once the correction is confirmed.

    • Website
    • Local fire station counter
  • Buildings under orders

    Buildings that a fire station has ordered to make corrections after an on-site inspection are published in a separate list. Both lists can be checked in advance by building name.

Fire-related filings up to opening are covered in our guide to opening a hotel after you buy it.

Hotel business license: whose name is it in?

A hotel business license is issued to the person running the business, not to the building. In the 23 wards it is granted by the ward mayor (Hotel Business Act, Article 3).

Take over the license, or obtain a new one

  • Take over the business

    1. The transferor and the transferee obtain the ward mayor's approval (Article 3-2)
    2. You take over the license with the business
  • Buy only the real estate

    1. Obtain a new license
  • Whether the name on the license, the facility address and the type of business (ryokan and hotel business, or simple lodging business) match the actual situation
  • Whether the structure or facilities have been changed since the license was granted, and if so, whether a notification of change was filed within 10 days (Hotel Business Act Enforcement Regulations, Article 4)
  • If the license is to be taken over, whether the contract schedule allows time to obtain the ward mayor's approval

Procedures for taking over the license, ward ordinances and how minpaku differs are explained in detail in our guide to the license when buying an operating hotel.

Land and rights: registry, zoning and roads

Certificates of registered matters (toki jiko shomeisho) for land and buildings
ItemDetails
Who can requestAnyone. No seal or ID is needed
WhereThe Legal Affairs Bureau. Requests can also be made online
What you needThe lot number (chiban) of the land and the building number (kaoku bango), which may differ from the street address (jukyo hyoji)
  • Whether the registered owner is the same as the seller, and whether the land and the building are registered in the same name
  • Whether mortgages or other rights are registered, and if so, whether there is a plan to remove them before handover
  • Whether the registered floor area and structure of the building differ greatly from the drawings and the building as it stands
  • Whether the zoning district allows hotels and ryokans. In Tokyo, also check whether the site is in an education district (bunkyo chiku)
  • Whether the site borders a road for 2 m or more (Building Standards Act, Article 43). A Tokyo ordinance requires longer road frontage for hotels

Which zoning districts allow hotels, and the road frontage lengths under the Tokyo Building Safety Ordinance, are set out in tables in our guide to converting a building or house into a hotel.

Roadworks under way in front of a building
Whether the road a site borders counts as a road under the Building Standards Act is checked with the ward's road section (illustrative).

Earthquake resistance: the June 1981 standards and assessment results

Seismic standards were tightened on 1 June 1981.

Start of construction that means old seismic standards
On or before 31 May 1981
Size at which an old-standard hotel or ryokan must have a seismic assessment and report it
3+ stories, 5,000 m²+
Size of building whose results Tokyo publishes
Over 10,000 m²
  • Explanation of important matters

    If an old-standard building has had a seismic assessment by an architect or a designated confirmation and inspection body, its content is explained (Real Estate Brokerage Act).

  • Published assessment results

    Results for hotels and ryokans that were required to be assessed are published under the Act on Promotion of Seismic Retrofitting of Buildings. In the 23 wards, Tokyo publishes the results for buildings over 10,000 m², and the ward for those at or below it. You can check the building name and rating on the Tokyo Seismic Portal and on each ward's website.

Published seismic assessment ratings (according to the Tokyo Seismic Portal)
RatingSafety against a major earthquake (seismic intensity of about upper 6 to 7)
ⅠHigh risk of toppling or collapsing
ⅡSome risk of toppling or collapsing
ⅢLow risk of toppling or collapsing

The Tokyo Metropolitan Government explains that a rating of Ⅰ or Ⅱ does not by itself mean a building is treated as violating the law. Whether to retrofit, and how much it would cost, needs an architect's judgment and an estimate.

Disasters: location on hazard maps

Since 28 August 2020, real estate brokers have explained in the explanation of important matters where the property sits on flood hazard maps.

What the explanation of important matters shows
ItemDetails
Flood hazard mapsMaps under the Flood Control Act for river flooding, inland flooding from rainwater and storm surge, showing the approximate location of the property. The latest map distributed by the ward is to be used, and showing evacuation shelters as well is considered desirable
Sediment disaster warning areasCovered if the property is inside one
Tsunami disaster warning areasCovered if the property is inside one

The Ministry of Land, Infrastructure, Transport and Tourism (MLIT) also asks brokers to make clear that a property outside the expected flood area is not free of flood risk.

For a lodging facility, also look at the following.

  • Whether there is a plan to evacuate the guests (needed for a lodging facility)
  • Whether there are guest rooms or electrical equipment below ground (if so, flooding has a greater impact)

Before you visit, enter the address on the Geospatial Information Authority of Japan's Hazard Map Portal Site. It helps discussions move faster.

For an operating hotel: handing over operations

Check whether the contracts needed to keep the business running can be taken over. The details differ by property, so get a list and copies of the contracts from the seller and check them.

  • The term and termination conditions of contracts with the operator and the cleaning company, and whether they can pass to the buyer
  • Who employs the staff, and the conditions if they are to keep working after handover
  • Whose name the booking site accounts and the reservation system are in, and how bookings that span the handover date and room charges already received are handled
  • Filings made in the current license holder's name, such as accommodation tax registration, and which ones the buyer needs to file again

We do not take on hotel operation. Operation after opening is under separate contracts with operators or partner companies.

Who checks what

Collecting records and making judgments based on them are done by different people.

Who collects and who judges
ItemWhat the buyer's broker collectsWhat to ask specialists
BuildingCertificates of confirmation and inspection, drawings, copies of periodic survey reports, viewing the summaries at the ward officeArchitect: compliance with the law, any violations or extensions, whether renovation is possible
Fire safetyCopies of inspection reports, checking the Tokyo Fire Department's published listsFire-safety contractor: condition of the equipment and estimates for repairs
LicenseCopy of the license, the ward's ordinance and guideAdministrative scrivener: taking over the license or a new license, advance consultation with the public health center
Land and rightsCertificates of registered matters, zoning district, type of roadJudicial scrivener: registration of the transfer of ownership and cancellation of mortgages
Earthquake resistanceConstruction date, whether a seismic assessment is reported in the explanation of important matters, published resultsArchitect: seismic assessment and retrofit costs
DisastersHazard maps and warning areas (shown in the explanation of important matters)Architect: flood preparedness and whether work is needed
TaxDocuments on the assessed value for fixed asset taxTax accountant: how tax differs depending on how you buy
People pointing at documents on a desk as they check them
We report the records we collect divided into confirmed facts and points that are still only assumptions.

The types of tax and rough amounts are set out in our guide to costs and taxes.

A checklist to print and use

We have put the items on one page so you can use it when asking the seller for documents and in meetings before the contract. For any item you cannot tick, decide how it will be handled in the contract terms or special provisions.

  • The certificates of confirmation and inspection are available. If not, an architect's survey of the current state has been commissioned
  • A copy of the most recent periodic survey report and records of how the points raised were dealt with have been received
  • There is no violation sign on the building, and the ward has been asked whether any correction order exists
  • Copies of the fire equipment inspection reports have been received, and repairs of defective items confirmed
  • Whether the building is subject to the periodic fire-prevention property inspection has been checked, and if so, a copy of the report received
  • The building is not in the Tokyo Fire Department's published violations or its list of buildings under orders
  • The name, address and type on the hotel business license have been checked, and it has been decided whether to take over the license or apply for a new one
  • The registered owner, mortgages and floor area have been checked on the certificates of registered matters
  • The zoning district, education district and road frontage have been checked
  • The date new construction began has been checked, and for an old-standard building, whether it has been assessed and any published results
  • Hazard maps and sediment disaster and tsunami warning areas have been checked
  • For an operating hotel, the terms for handing over operation, cleaning, staff and reservations have been received in writing
  • It has been agreed what the architect, administrative scrivener and tax accountant each look at, and by when

Questions

Should I avoid buying a building that has not filed periodic survey reports?

Not reporting means the owner is not meeting the duty under Article 12 of the Building Standards Act. That alone does not make the building impossible to buy, but it means nobody has checked the condition of the exterior walls or the evacuation facilities. Have an architect look at it before you sign, and agree whether the seller or the buyer bears the cost of resuming the reports.

Does a seismic rating of Ⅰ or Ⅱ mean the building breaks the law?

The Tokyo Metropolitan Government explains that a rating of Ⅰ or Ⅱ does not in itself mean the building is treated as violating the law. The rating does mean, however, that the risk of collapse in a major earthquake is high, or that there is some risk. Have an architect estimate the cost and duration of retrofit work before deciding whether to buy.

How much will the broker investigate?

In the explanation of important matters, a real estate broker explains the registry, the zoning district, the location on hazard maps, whether an old-standard building has had a seismic assessment, and whether there are records of an asbestos survey. Judging whether a building complies with the law or is structurally safe is an architect's job, and the broker cannot make that judgment.

Can a building without a certificate of inspection keep operating as a hotel?

Even for a building that is already operating, without a certificate of inspection it takes more work to show that it complies with the law when you extend it, change its use or apply for the license again. How an architect surveys the current state is explained in our guide to converting a building or house into a hotel.

BEFORE YOU SIGN

We check the documents and public records before you sign

Send us the address of the property you are considering and the documents you have. Before we start, we show you the scope and cost of a preliminary survey that collects and checks the registry, the zoning district, the building and fire documents, and the seismic and hazard map records. Judgments on the building's legal compliance and earthquake resistance are for an architect, and license procedures for an administrative scrivener.

Sources (official documents)